Symmetric

Implementation of SCADA, CCTV, and Fire Alarm Systems at Belectric Renewables' 100 MW Pavgad Solar Farm

Case Study

Surveillance CCTV System for Solar farm

Bandra-Worli Link Road

Hosur Road Highway Toll Management

Project Overview

Belectric Renewables commissioned a comprehensive monitoring and security infrastructure for its 100 MW solar farm in Pavgad. Symmetric was entrusted with the design, procurement, and deployment of SCADA connectivity, a Bosch CCTV surveillance system, and a Bosch fire alarm system to ensure seamless operations, enhanced security, and safety compliance.

Project Objectives:

  • Establish SCADA connectivity for real-time monitoring and control of solar farm operations.
  • Deploy a robust Bosch CCTV surveillance system for enhanced security.
  • Implement an advanced Bosch fire alarm system to mitigate fire hazards.
  • Ensure seamless integration of all systems for centralized management.

Project Scope & Implementation:

Symmetric IT Services Pvt. Ltd. designed and deployed an end-to-end network infrastructure tailored to the client’s specific needs. The solution included:

  1. SCADA Connectivity:
  • Designed and implemented a state-of-the-art SCADA system for monitoring critical operational parameters.
  • Integrated communication networks to enable real-time data acquisition and remote control capabilities.
  • Ensured redundancy and reliability in data transmission for uninterrupted performance.
  1. Bosch CCTV Surveillance System:
  • Installed high-resolution Bosch CCTV cameras across key areas of the solar farm.
  • Configured intelligent video analytics to detect unauthorized access and potential threats.
  • Integrated the CCTV system with a centralized monitoring center for real-time surveillance and response.
  1. Bosch Fire Alarm System:
  • Deployed a Bosch fire alarm system with advanced smoke and heat detection capabilities.
  • Configured automated alerts to trigger emergency response mechanisms in case of fire incidents.
  • Ensured compliance with fire safety regulations and industry best practices.

Challenges & Solutions:

  • Remote Location & Infrastructure Limitations:
    • Solution: Established a robust communication backbone to support SCADA, CCTV, and fire alarm systems.
  • Integration of Multiple Systems:
    • Solution: Developed a unified platform for seamless interoperability between all subsystems.
  • Security & Safety Concerns:
    • Solution: Implemented multi-layer security measures, including access control and surveillance.

Results & Benefits:

  • Enhanced operational efficiency with real-time monitoring and automation.
  • Improved security through 24/7 surveillance and proactive threat detection.
  • Increased safety compliance with an advanced fire detection and response system.
  • Reduced downtime and optimized performance of solar farm assets.

Conclusion:

The successful deployment of SCADA, CCTV, and fire alarm systems at the 100 MW Pavgad solar farm has reinforced Belectric Renewables’ commitment to operational excellence, security, and safety. Symmetric’s expertise in system integration and project execution played a pivotal role in achieving the project’s objectives within the stipulated timeline. This project serves as a benchmark for future renewable energy infrastructure developments.